C.R.E. No. 24.
Kowloon Canton Railway.
BRITISH SECTION
ESTIMATE.
Main Head Bridges.
Sub. Head Winer No.12.
Work Three 20' Arches P.A. at Chain 30:4.
C.R.E. No. 110B2.
Quantity DESCRIPTION Unit Rate $ Cts. 42000 Excavation in founds. 10/- 420 00 12150 Concrete in founds. 35/- 2100 Masonry in Footings. 40/- 25600 Suprstructure. # 4450 Arching. # 750 Coping. 6500 Dry-stone Pitching, 40/- 4252 2/- c.ft. 840 2/-o.ft. 10240 10/- Total 26802 50 Contingincies 10% 2680 25 $29482 75 Grand Total2)
.CowlisЯ notna noolwo
201to32 HRITIяA
3TAMIT23
JZ HOLZ
2.
ZOLTIAD-30
·196.6.
100
C.R.E. No. 24.
Kowloon Canton Railway.
BRITISH SECTION
ESTIMATE.
boh nish
Main Head Bridges.
Watt Auf
Sub. Head Winer No.12.
Work Three 20' Arches P.A. at Chain 30:4.
C.R.E. No. .110B2.
AMOUNT.
Quantity
DESCRIPTION.
Rate.
Unit.
$
Cts.
42000
Excavation in founds.
10/m
12150
2100
Concrete in founds.
35/-
Masonry in Footings.
40/-
#
25600
Suprstructure.
4450
#
Arching.
750
" Coping.
6500 Dry-stone Pitching,
40/m
2/- c.ft.
2/-o.ft.
10/-
KKK Re
4252
840
10240
890000.
:
420
00.
50.
00.
00.
1500
00.
650
00.
Total
26802
50
Contingincies 10%
2680
25
$29482 75